John Radcliffe Hospital – Oxford.
 |
Power Point Presentation
(10MB File -Broadband Recommended)
|
In 2006 we were asked to undertake a complete replacement of a fuelling solution for the boiler and standby generator for the new Children’s Hospital extension that was being built.
We chose suitable siting for the two new 95,000 litre above ground tanks that were to be installed, however it meant removing one of the existing tanks in order to utilise the existing bunding area.
New pipework was installed including new fill cabinets, pump sets and an electronic tank content gauging system which was linked to their central Building Management System.
The power point presentation shows the various stages this project underwent and should give you a more comprehensive feel to the way we work.
|